Fireboat Alexander Grantham
was docked into a site of its museum on Friday, 10 March 2006.
Stage 1: Site Preparation
Stage 2: Mega Marine Crane
Stage 3: Escorted Approach
Stage 4: Into Side Bay
Stage 5: Cables Connection
Stage 6: Preliminary Lifting
Stage 7: Into Front Bay
Stage 8: Beyond the Water
Stage 9: Safely Landed
The Museum and The Fun Day on Saturday, 12 April 2014